Your Legal Arsenal
Consumer protection laws, documentation strategies, and evidence collection that wins cases.
The Consumer Protection (Fair Trading) Act: Your Secret Weapon
Most homeowners don't realize they have significant legal protection under the CPFTA. This law is surprisingly broad and covers many contractor behaviors as 'unfair practices'.
Understanding these protections transforms you from vulnerable consumer to empowered homeowner with legal recourse.
What Constitutes 'Unfair Practice' in Renovation
Unfair Practice | What It Looks Like | Your Recourse |
---|---|---|
False Claims | 'We're HDB approved' (when not) | Sue for misrepresentation |
Misleading Representations | 'Need electrical upgrade for safety' (unnecessary) | Claim for unnecessary costs |
Taking Advantage | Overcharging because you don't know rates | Claim price difference |
Accepting Payment Without Ability | Taking deposit knowing they're closing | Full refund + damages |
Unauthorized Variations | Changing materials without consent | Cost of rectification |
Lemon Law Reality Check
The Documentation Masterclass
Your phone is your best legal tool. Courts accept digital evidence, but only if properly collected and preserved.
Morning: Photo of workers on site
💡 Proves contractor was working on specific dates
Morning: Photo of materials being used
💡 Verify correct materials per contract
Morning: Screenshot WhatsApp discussions
💡 Preserve conversations before deletion
Evening: Video walkthrough of work done
💡 Shows progress and quality issues
Evening: Close-ups of any concerns
💡 Document defects immediately
Evening: Photo of debris/protection
💡 Evidence of site management
The Legal Power of WhatsApp
Singapore courts recognize WhatsApp as legal documentation. After any verbal discussion, always follow up with a written confirmation.
WhatsApp Confirmation Template
Defect Documentation System
- Take photo with ruler/tape measure (shows scale)
- Take wide shot (shows context)
- Take close-up (shows detail)
- Send to contractor with description
- Set specific deadline for rectification
- Save contractor's response
- If not rectified, repeat with reminder
- Create PDF of entire exchange for tribunal
Building Your Evidence Archive
Organize evidence from day one. When disputes arise, organized documentation wins cases.