Your Protection Toolkit
Master checklists, payment formulas, and evidence systems that prevent 95% of disputes.
Your Master Protection System
This toolkit contains everything you need to prevent 95% of renovation disputes. Use these checklists, formulas, and systems religiously.
The Contractor Interview Scorecard
Criteria | Points (1-5) | Red Flag If... |
---|---|---|
Business Registration | _____ | Less than 2 years old |
Physical Office | _____ | No fixed address |
Portfolio Verification | _____ | Can't contact references |
CaseTrust Status | _____ | Not accredited |
Quote Detail | _____ | Lump sum pricing |
Payment Terms | _____ | More than 30% upfront |
Timeline Commitment | _____ | 'Estimated' only |
Communication Style | _____ | Pushy or evasive |
Contract Willingness | _____ | Resists detailed contract |
Insurance Coverage | _____ | No proof provided |
Score below 35/50 = High risk, reconsider
The Payment Protection Formula
Never let contractor have more money than work completed. This formula keeps you in control:
Work Completed | Maximum Paid | Your Leverage |
---|---|---|
0% | 10-15% | Minimal risk |
25% | 20-25% | Strong position |
50% | 40-45% | Balanced |
75% | 60-65% | Maintain control |
90% | 75-80% | Final leverage |
100% + defects cleared | 100% | Complete |
Never Exceed Formula
The Daily Site Inspection Checklist
Critical items: 0/5
Work matches specifications
CRITICALMaterials are as quoted
CRITICALWorkmanship acceptable
CRITICALTimeline on track
Site cleaned daily
Protection maintained
Photos taken
CRITICALDefects noted and communicated
CRITICALContractor response recorded
The Evidence Archive System
Organization wins cases. Create this folder structure from day one:
Folder Structure
Pre-Renovation Master Checklist
Critical items: 0/10
Set realistic budget with 20% buffer
CRITICALResearch market rates for your scope
CRITICALGet 5+ quotations minimum
CRITICALVerify CaseTrust accreditation
CRITICALCheck ACRA registration
CRITICALVisit physical office
Contact past clients
CRITICALReview contract with all 12 essential clauses
CRITICALPayment schedule protects you
CRITICALMaterials specified exactly
CRITICALTimeline with penalties included
CRITICALContract reviewed by experienced person